{"id":49680,"date":"2016-05-11T12:27:12","date_gmt":"2016-05-11T10:27:12","guid":{"rendered":"http:\/\/www.hkarchitekten.at\/projekt\/schule-bizau\/"},"modified":"2025-07-28T17:56:50","modified_gmt":"2025-07-28T15:56:50","slug":"schule-bizau","status":"publish","type":"projekt","link":"https:\/\/www.hkarchitekten.at\/en\/project\/schule-bizau\/","title":{"rendered":"Primary School, Bizau"},"content":{"rendered":"<p><strong>Old and new: gabled versus flat roof, window openings versus strip windows, and shingles versus horizontal cladding.<\/strong><\/p>\n<p>After an intense review period, the council decided against relocating the school and community hall in favour of refurbishment. The four-room elementary school had sufficient teaching space at its disposal, but lacked the essential auxiliary rooms. The existing community hall was obsolete by modern standards. The classrooms were left intact, but the rest of the building was demolished. The classrooms were furnished with timber ceilings and a new building envelope. The new rooms are now timber lined.<\/p>\n<p>On the street side section of the building, the original proportions remain largely intact. Given the short construction time, the new hall had to be built of timber as well. A cubic mass with a flat roof adjoins the gable-roofed wing. It has been inserted crosswise below the eaves of the old building and abuts the street. Repeating the shingle pattern of the existing building in a slightly different variation, the community hall has been dressed in horizontal larch. Walls and ceilings are made of fir timber sourced from local forests. The front wall has been furnished with thermal collectors; heat is stored in a boiler tank and fed into the basement ceiling\u2019s thermal system. As a result the complex was able to develop low energy standards.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Durch ein intensives B\u00fcrgerbeteiligungsverfahren und<br \/>\neinen offenen Diskussionsprozess kam man in der Gemeinde<br \/>\nzu dem Schluss, Schule und Gemeindesaal am urspr\u00fcng &#8211;<br \/>\nlichen Standort zu belassen, jedoch neu zu interpretieren.<br \/>\nDie bestehende vierklassige Volksschule gen\u00fcgte zwar in<br \/>\nder Klassenzahl und -gr\u00f6\u00dfe, die n\u00f6tigen Nebenr\u00e4umlichkeiten<br \/>\nfehlten aber g\u00e4nzlich. Der bestehende Saal war<br \/>\nebenfalls funktional sehr mangelhaft. Deshalb wurde das<br \/>\nGeb\u00e4ude bis auf die Klassen abgetragen. Um die gemauerten,<br \/>\nmit Holzdecken versehenen Klassenr\u00e4ume wurden<br \/>\neine neue H\u00fclle und neue stra\u00dfenseitige Raumschichten<br \/>\nin Holz wieder aufgebaut, wobei die \u00e4u\u00dfere Erscheinung<br \/>\nin den Proportionen ziemlich erhalten blieb. Wegen der<br \/>\nkurzen Bauzeit kam auch f\u00fcr den Neubau des Saales nur<br \/>\nHolz infrage. Er wurde als flachgedeckter Kubus quer an<br \/>\nden steilgedeckten Schulteil angesetzt und unter dessen<br \/>\nTraufe bis zur Stra\u00dfe \u201edurchgeschoben\u201c.<\/p>\n","protected":false},"featured_media":38618,"template":"","tags":[564],"publik":[1021],"projekt-art":[958,1018],"projekt-land":[1046,938],"projekt-status":[979],"projekt-kategorie":[1040],"projektphase":[],"class_list":["post-49680","projekt","type-projekt","status-publish","has-post-thumbnail","hentry","tag-schule-en","publik-project-description","projekt-art-bauen-im-bestand","projekt-art-construction-in-existing-buildings","projekt-land-austria","projekt-land-oesterreich","projekt-status-completed","projekt-kategorie-education","projektkategorie-conversions","projektkategorie-education","projektkategorie-public","projektkategorie-sports"],"acf":[],"_links":{"self":[{"href":"https:\/\/www.hkarchitekten.at\/en\/wp-json\/wp\/v2\/projekt\/49680","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.hkarchitekten.at\/en\/wp-json\/wp\/v2\/projekt"}],"about":[{"href":"https:\/\/www.hkarchitekten.at\/en\/wp-json\/wp\/v2\/types\/projekt"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.hkarchitekten.at\/en\/wp-json\/wp\/v2\/media\/38618"}],"wp:attachment":[{"href":"https:\/\/www.hkarchitekten.at\/en\/wp-json\/wp\/v2\/media?parent=49680"}],"wp:term":[{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.hkarchitekten.at\/en\/wp-json\/wp\/v2\/tags?post=49680"},{"taxonomy":"publik","embeddable":true,"href":"https:\/\/www.hkarchitekten.at\/en\/wp-json\/wp\/v2\/publik?post=49680"},{"taxonomy":"projekt-art","embeddable":true,"href":"https:\/\/www.hkarchitekten.at\/en\/wp-json\/wp\/v2\/projekt-art?post=49680"},{"taxonomy":"projekt-land","embeddable":true,"href":"https:\/\/www.hkarchitekten.at\/en\/wp-json\/wp\/v2\/projekt-land?post=49680"},{"taxonomy":"projekt-status","embeddable":true,"href":"https:\/\/www.hkarchitekten.at\/en\/wp-json\/wp\/v2\/projekt-status?post=49680"},{"taxonomy":"projekt-kategorie","embeddable":true,"href":"https:\/\/www.hkarchitekten.at\/en\/wp-json\/wp\/v2\/projekt-kategorie?post=49680"},{"taxonomy":"projektphase","embeddable":true,"href":"https:\/\/www.hkarchitekten.at\/en\/wp-json\/wp\/v2\/projektphase?post=49680"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}