{"id":49760,"date":"2016-05-11T12:37:38","date_gmt":"2016-05-11T10:37:38","guid":{"rendered":"http:\/\/www.hkarchitekten.at\/projekt\/volks-u-hauptschule-schwarzach\/"},"modified":"2025-07-28T17:56:11","modified_gmt":"2025-07-28T15:56:11","slug":"volks-u-hauptschule-schwarzach","status":"publish","type":"projekt","link":"https:\/\/www.hkarchitekten.at\/en\/project\/volks-u-hauptschule-schwarzach\/","title":{"rendered":"Primary &#038; Elementary School, Schwarzach"},"content":{"rendered":"<p><strong>A vibrant, efficient and sympathetic expansion of a popular community school. <\/strong><\/p>\n<p>The existing primary and elementary school, which are located behind the church, can be reached via paths on both sides of the church. By raising the entrance area, an essential accessibility requirement, a redesign of the school playground was possible. From the entrance you enter a foyer, and from there the new inner courtyard opens up.<\/p>\n<p>The extension of the school was made in lightweight construction to the west on the existing gym. The rooms for the elementary school, including the management offices, are located upstairs. The rooms for the main school are located on the ground floor. The special education rooms, which are used by both schools, are easily accessible via two staircases, as well as the lift.<\/p>\n<p>The new intensive colour scheme gives the corridors, and the courtyard, a new appearance and sense of space. Due to the sensitive handling of the existing buildings and the utilisation of the existing rooms, a cost-effective extension, renovation and architectural upgrading of the primary and elementary school became possible. The energy consumption of approx. 50 &#8211; 60 kWh \/ m\u00b2a was achieved by the refurbished outer shell and a controlled ventilation of the classrooms.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Die bestehende Haupt- und Volksschule, welche in zweiter Reihe hinter der Kirche liegt, kann \u00fcber klare Wege beidseitig der Kirche erreicht werden.<br \/>\nDurch die Anhebung des Eingangsbereiches wurde eine behindertengerechte Erschliessung des Eingangs, welcher sich im Blickfeld und im Bezug zu der Hofsteigstrasse befindet sowie eine Neugestaltung des Schul- Kirchhofes m\u00f6glich.<br \/>\nVom Eingang aus betritt man einen Foyer \u2013 Aula Bereich, von welchem auch der neue Innenhof erschlossen wird.<br \/>\nDie Erweiterung der Schule erfolgte durch eine Aufstockung in Leichtbauweise in Richtung Westen auf den bestehenden Gymnastikraum.<\/p>\n","protected":false},"featured_media":38303,"template":"","tags":[564],"publik":[1021],"projekt-art":[958,1018],"projekt-land":[1046,938],"projekt-status":[979],"projekt-kategorie":[1040],"projektphase":[],"class_list":["post-49760","projekt","type-projekt","status-publish","has-post-thumbnail","hentry","tag-schule-en","publik-project-description","projekt-art-bauen-im-bestand","projekt-art-construction-in-existing-buildings","projekt-land-austria","projekt-land-oesterreich","projekt-status-completed","projekt-kategorie-education","projektkategorie-conversions","projektkategorie-education","projektkategorie-public","projektkategorie-sanierung-en","projektkategorie-sports"],"acf":[],"_links":{"self":[{"href":"https:\/\/www.hkarchitekten.at\/en\/wp-json\/wp\/v2\/projekt\/49760","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.hkarchitekten.at\/en\/wp-json\/wp\/v2\/projekt"}],"about":[{"href":"https:\/\/www.hkarchitekten.at\/en\/wp-json\/wp\/v2\/types\/projekt"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.hkarchitekten.at\/en\/wp-json\/wp\/v2\/media\/38303"}],"wp:attachment":[{"href":"https:\/\/www.hkarchitekten.at\/en\/wp-json\/wp\/v2\/media?parent=49760"}],"wp:term":[{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.hkarchitekten.at\/en\/wp-json\/wp\/v2\/tags?post=49760"},{"taxonomy":"publik","embeddable":true,"href":"https:\/\/www.hkarchitekten.at\/en\/wp-json\/wp\/v2\/publik?post=49760"},{"taxonomy":"projekt-art","embeddable":true,"href":"https:\/\/www.hkarchitekten.at\/en\/wp-json\/wp\/v2\/projekt-art?post=49760"},{"taxonomy":"projekt-land","embeddable":true,"href":"https:\/\/www.hkarchitekten.at\/en\/wp-json\/wp\/v2\/projekt-land?post=49760"},{"taxonomy":"projekt-status","embeddable":true,"href":"https:\/\/www.hkarchitekten.at\/en\/wp-json\/wp\/v2\/projekt-status?post=49760"},{"taxonomy":"projekt-kategorie","embeddable":true,"href":"https:\/\/www.hkarchitekten.at\/en\/wp-json\/wp\/v2\/projekt-kategorie?post=49760"},{"taxonomy":"projektphase","embeddable":true,"href":"https:\/\/www.hkarchitekten.at\/en\/wp-json\/wp\/v2\/projektphase?post=49760"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}