Customize Consent Preferences

We use cookies to help you navigate efficiently and perform certain functions. You will find detailed information about all cookies under each consent category below.

The cookies that are categorized as "Necessary" are stored on your browser as they are essential for enabling the basic functionalities of the site. ... 

Always Active

Necessary cookies are required to enable the basic features of this site, such as providing secure log-in or adjusting your consent preferences. These cookies do not store any personally identifiable data.

Functional cookies help perform certain functionalities like sharing the content of the website on social media platforms, collecting feedback, and other third-party features.

No cookies to display.

Advertisement cookies are used to provide visitors with customized advertisements based on the pages you visited previously and to analyze the effectiveness of the ad campaigns.

No cookies to display.

Primary School, Bizau
Primary School, Bizau

Project Information

95_25

Builder-Owner
Gemeinde Bizau

Location
Bizau

Completition
1999

Project facts
n.b.ar. 1.950,00 m², GFA 2.380,00 m²,
GBV 9.640,00 m³

Rights
Text Otto Kapfinger / Hermann Kaufmann WOOD WORKS,
Translation Bronwen Rolls

Photo Bruno Klomfar

Project Stakeholders
  • Structural Engineering
    M+G Ingenieure, DI Josef Galehr, Feldkirch
  • Heating Ventilation and Sanitary Planning
    GMI Ingenieure, Dornbirn
  • Electronics Planning
    Ing. Willi Meusburger, Bezau
  • Building Physics/Acoustics
    DI Dr. Lothar Künz ZT GmbH, Hard
  • Building Physics/Acoustics
    Ing. Karl Brüstle, Dornbirn


Primary School, Bizau

Old and new: gabled versus flat roof, window openings versus strip windows, and shingles versus horizontal cladding.

After an intense review period, the council decided against relocating the school and community hall in favour of refurbishment. The four-room elementary school had sufficient teaching space at its disposal, but lacked the essential auxiliary rooms. The existing community hall was obsolete by modern standards. The classrooms were left intact, but the rest of the building was demolished. The classrooms were furnished with timber ceilings and a new building envelope. The new rooms are now timber lined.

On the street side section of the building, the original proportions remain largely intact. Given the short construction time, the new hall had to be built of timber as well. A cubic mass with a flat roof adjoins the gable-roofed wing. It has been inserted crosswise below the eaves of the old building and abuts the street. Repeating the shingle pattern of the existing building in a slightly different variation, the community hall has been dressed in horizontal larch. Walls and ceilings are made of fir timber sourced from local forests. The front wall has been furnished with thermal collectors; heat is stored in a boiler tank and fed into the basement ceiling’s thermal system. As a result the complex was able to develop low energy standards.


Public

    Awards
  • Vorarlberger Hypo-Bauherrenpreis
    2001
    Publications
  • Umbau Schule und Neubau, Saal Bizau
    ZN Z-091, Baukunst und Energieeffizienz, Symposium 2002, S. 58-63