Kaufmann Holz AG – Factory Hall Au, Reuthe

Kaufmann Holz AG – Factory Hall Au, Reuthe
Builder-Owner
Kaufmann Holz AG
Location
Reuthe
Completion
1992
Projectfacts
n.b.ar. 9.700,00 m²

A rapid and effective realisation of a vast timber facility. 

On 19 August 1992 a major fire at Kaufmann Holzbauwerk, in Reuthe, destroyed a 7,000 m2 hall with facilities for drying and sorting of timber, as well as 7,000 m³ of dry and processed stock. It was paramount to quickly turn around a new hall and a warehouse for all sorting and drying of timber, for the company to get back to business.

For planning and building permits 4 weeks where scheduled for the construction of 10,000 m², building, an estimated 2 months. Therefore the design of the hall is based on a very easy to assemble and build concept. The new building material Intrallam LSL, which is manufactured in large-sized panels, was the most suitable product for this purpose. The large format allows a high degree of prefabrication and thanks to the high strength qualities this plate could be used not only as a space-enclosing element, but also as a support. During the foundation work, the prefabrication of the roof and wall elements in the timber framed hall was carried out in shifts. After erecting the first two main trusses, they immediately went on to lay the roof elements and weld the sealing foils. This continuous development process of the construction also includes the lengthwise wall made of timber. After seven weeks of construction the hall could be used again in time for Christmas.

Read more

The building is divided into two sections with different widths. The pylons consist of 2 HEA profiles each, with diagonals connected to a grid support. All other supports are made of timber, with Parallam, glued laminated timber or a cross-section composed of these materials, depending on the load and constructional considerations.

The two BSH twin carriers act as a continuous beam, while the intermediate Parallam sections compensate for the horizontal pressure component of the bracing and form the substructure for the drainage channel. The secondary carrying system was made of the large-sized Intrallam plates which are bent and connected with curved glued ribs. Together with the steel tie rods, the ribbed panels act like a double hinged arch. The load of 380 kg /m2 required the use of 40 mm thick plates and 3 ribs per plate. Two anchor steels were used under tension. The walls were also folded large Intrallam panels and transfer both load baring weight and wind forces to the main columns of the building. The design of this hall was carried out within a planning team involving engineers, builders and architects. This interdisciplinary process was necessary for planning efficiency.

Weniger zeigen
Kaufmann Holz AG – Factory Hall Au, Reuthe
Kaufmann Holz AG – Factory Hall Au, Reuthe
Kaufmann Holz AG – Factory Hall Au, Reuthe
Kaufmann Holz AG – Factory Hall Au, Reuthe

Projectdetails

Project support
Structural Engineering
DI Ingo Gehrer, Höchst, merz kaufmann partner GmbH, Dornbirn
Publikationen
Langspanholz
B-027Ambrozy / GiertlovaPlanungshandbuch Holzwerkstoffe, S. 206-209-2005
Kaufmann Holz – AG Warehouse
Z-118World Architecture, 8/2005, S. 45-472005
Jedinecne krabice z Vorarlbergu
Z-031ARCH o architektúre a inej kultúre , marec 2001, S. 16-182001
Holzrahmenbau und Rippendecken
B-010Landsberg / PinkauHolzsysteme für den Hochbau, S. 198-199, S. 144-1451999
Industriebau – ein Thema?
B-003Sommer / Weißer / HolletschekArchitektur für die Arbeitswelt, S. 21-221995
Lagerhalle Holzbauwerk Kaufmann
B-035Neues Bauen in den Alpen, Architekturpreis 1995, S. 52-571995
Holzbauwerk Kaufmann
B-013architektur & wirtschaft, Journal internat. Bodenseeregion, S. 30-311993
Copyrights
Text
Hermann Kaufmann + Partner ZT GmbH, Englisch: Bronwen Rolls
Photography
Ignacio Martinez
more Projects