Sportplatzweg, Schwarzach

Sportplatzweg, Schwarzach
Builder-Owner
Miterrichtergemeinschaft Kaufmann/Lenz/Gmeiner und Fa. Revital Bauträger GmbH
Location
Schwarzach
Completion
1999
Projectfacts
n.b.ar. 1.390,00 m², GFA 1.670,00 m²,
GBV 4.220,00 m³

A 58-meter-long timber “living cube” floats above an architectural office space.

This ‘living cube’ protrudes north and south, with a sheltered, covered entrance and access on the north side, with a shaded facade on the south. The cube is clad with plywood, while the base is covered with painted OSB panels. The basement ceiling is designed as a heavily insulated timber construction. The ground floor ceiling, due to the energy and building climatic considerations, is designed as an in-situ concrete slab which takes on an additional function of cooling.

The upper floor is executed in a 35 cm thick insulated timber construction. The roof is made up of narrow Douglas fir BSH girders and is designed as a ‘warm roof’ with 45 cm thermal insulation. This creates a bright, open, transparent office space on the ground floor and generous apartment with a wide terrace on the upper floor, which is accessed by a timber, external staircase, which is protected by translucent panels.

The building is an expression of how the Kaufmann / Lenz / Gmeiner office thinks and works: a clear, pragmatic architectural language with building structures that emerge from the sensible use of materials, and that also have a high degree of ecological responsibility.

Office and apartments are equipped with controlled ventilation; the additional heating is via a gas boiler. Based on the building simulation, a heating energy consumption of 23 kWh / m2 a year can be expected on the upper living floor. 10 KWh / m2 can be expected in the offices due to the greater internal energy sources.

Projectdetails

Project support
Kooperation
DI Christian Lenz
Project Leader
DI Christian Lenz
Cost Planning
Technical planning
Structural Engineering
M+G Ingenieure, Feldkirch, Statikbüro Galehr, Feldkirch
Heating Ventilation and Sanitary Planning
Ing. Peter Naßwetter, Batschuns
Electronics Planning
Hecht Elektroplanung, Rankweil
Building Physics
DI Dr. Lothar Künz ZT GmbH, Hard
Acustic
Ing. Karl Brüstle, Dornbirn
Landscape Planning
DI Barbara Bacher, Linz
Certificates
Awards
Haus der Zukunft – BM für Wirtschaftliche Angelegenheiten
2000Preis
Publikationen
Wohn-und Bürobau Sportplatzweg
B-059Fassaden aus Holz, S. 82-832010
Flexieble Nutzung: Büro und Wohngebäude in Schwarzach
B-036Gonzalo / HabermannEnergieeffiziente Architektur, S. 122-1272006
“Vorarlberg” und “Moderner Holzab” gehören einfach zusammen
Z-117Jörg PfäffingerDas Bauzentrum | Baukultur, 12/2004, S. 10-152004
Energieeffizienz in Vorarlberg – Büros und Wohnungen in Schwarzach
Z-088Manuel PestalozziArchitektur & Technik, 12/2001, S.162001
Bürogebäude
B-012Cerliani/BaggenstosHolzplattenbau, S. 154-1572000
Büro- und Wohnbau Sportplatzweg
Z-013Haus der Zukunft, S. 8-92000
Copyrights
Text
Hermann Kaufmann + Partner ZT GmbH, Englisch: Bronwen Rolls
Photography
Ignacio Martinez
Warning: Undefined array key 1 in /home/.sites/3/site2726081/web/v74/wp-content/plugins/n0-blocks-2.5.5d/build/n0-autogallery/render.php on line 247
more Projects