Allmeinteilweg – BA 5, Ludesch

Allmeinteilweg - BA 5, Ludesch
Builder-Owner
Vogewosi, Dornbirn
Location
Ludesch
Completion
2007
Projectfacts
n.b.ar. 775,92 m², GFA 915,26 m²,
GBV 3.444,85 m³
Energie 48 kWh/m²a

Prefabricated, state of the art living.

At the heart of Allmeinteilweg lies an innovative installation which is prefabricated, right down to its sockets, in the workshop. The plumbing unit is also prefabricated, complete with fittings. The 2.80 m wide and three-story high components were delivered in one piece and mounted on top of the ground slab.

The state-of-the-art building utilities include solar panels for hot water, a pellet-biomass heating unit, separate cold and hot water meters and a photovoltaic unit mounted on the facade of the south wing.

The challenging shape of the plot is optimally used to maximise green spaces. The staircase units come with structural shafts which can later be used to install elevators when additional funding becomes available.

Allmeinteilweg - BA 5, Ludesch
Allmeinteilweg - BA 5, Ludesch
Allmeinteilweg - BA 5, Ludesch
Allmeinteilweg - BT 5

Project Details

Project support
Project Management
Bmst. Ing Norbert Kaufmann, Helmut Bilgeri – Vogewosi
Technical planning
Structural engineering for timber construction
merz kaufmann partner GmbH, Dornbirn
Structural engineering for solid construction
DI Ernst Mader, Bregenz
Heating Ventilation and Sanitary Planning
Michael Gutbrunner, Dornbirn
Electronics Planning
Peter Hämmerle, Lustenau
Building Physics
DI Dr. Tech. Lothar Künz, Hard