Hotel Bellevue, Les Houches

Hotel Bellevue, Les Houches , Projekt 08_25
Builder-Owner
Sarl le Prarion (Yves Hottegindre), St. Gervais les Bains
Location
St. Gervais les Bains
Completion
2010
Projectfacts
n.b.ar. 895,60 m², GFA 1.163,00 m²

Maintaining a traditional facade, but giving it an ecological and sympathetic ‘timber heart’.

For an architect, accustomed to using their creative potential for the development of new, contemporary structures, this task presented an unusual challenge. A total reconstruction was required to create a fully functioning modern hotel, but nothing could change with regards to its size or appearance. The shell limited the scope, so it was important to bring as rational, and as economical, a solution to life inside the tight restraints. The result is a small, manageable and very familiar and cosy mountain hotel, which offers a very special experience in the simplest way.

While preserving the “old picture” to the outside, the building was designed according to the most modern methods, with special attention to comprehensive sustainability. The core of the hotel is built of solid spruce timber. These supporting elements are always visible, forming the warm and comfortable shell in this harsh mountainous environment. These timber elements were prefabricated and assembled in a very short time. The timber “heart” was then wrapped with a 28 cm thick heat-insulating layer, which in turn is protected by a 12 cm thick brick wall. This is plastered to correspond to the appearance of the old hotel.

Read more

The soft and warm characteristic of the timber offers the guest a naturally pleasant ambience and is protected by the hard and resistant building material brick. This construction saves a lot of “Gray energy”, i.e. energy for the construction and production of the building, because timber was created by solar energy.

The optimally insulated building envelope also guarantees that very little energy is required to heat the house. Here a so-called “Passive House” was created. Simply put, this building only needs between 10 and 20% of the heating energy compared to conventional buildings. In addition to optimum thermal insulation there are special windows, with triple glazing. At the heart of this is a ventilation system that supplies the building with the necessary fresh air and returns the energy from the waste air, which is normally lost, to the building via heat exchangers. Together with a heating system, which derives its energy from the ground, an energetic and ecological flagship project has been created.

Weniger zeigen
08_25-1
08_25-4
08_25-3

Project Details

Project support
Project Management
Colleague
ADE Guillaume E. Weiss, Arch. DPLG Peter Wendling
Building Site Manager
Bureau de control
Socotec, Cran Gevrier
Technical planning
Structural Engineering
merz kley partner ZT GmbH, Dornbirn, GP-Structures, Sallanches
Heating Ventilation and Sanitary Planning
ITF, St. Alban-Leysse
Electronics Planning
ITF, St. Alban-Leysse
Building Physics / Acoutics
Copyrights
Text
Hermann Kaufmann + Partner ZT GmbH
Texttranslation
Photography
Hermann Kaufmann + Partner ZT GmbH
More Projects