Kaufmann Michael – Beam Assembly Hall, Reuthe

Kaufmann Michael – Beam Assembly Hall, Reuthe
Builder-Owner
Kaufmann Michael
Location
Reuthe
Completion
1990

Only by focusing on the details does a timber construction begin to come alive.

The building demonstrates the new ways and potential of modern timber construction. Great attention was paid to fine-detail, which is possible through intelligent design. Only by focusing on the details does a timber construction begin to come alive.

The aim was to insert a new 16 x 45 m heated assembly hall into the existing building structure and to develop an easy-to-install construction system based on a high degree of prefabrication, keeping the construction time as short as possible. This project should also provide technical proof of the efficient and modern way of thinking of the company has. The design resolves conflicting constructive elegance and functionality and subverts practicable methods of production and installation.  It demonstrates the possibilities of surface design as well as the combination of timber and glass, but without questioning the economic efficiency.

Joists, resting on clamped supports, consist of a double-girder truss and a solid wall girder; with the purlins suspended from them form the main construction of the hall. The indoor element was mounted on the ground and lifted by crane onto the supports. The facade was also prefabricated and, together with the outer cladding, attached to the structure as a whole element (no scaffolding necessary). The construction time for the carpenters took only one week. In order to obtain as much reflected light as possible, the soffits and the lights were painted white. The construction was left natural. The floor was also made of timber. In the process, strips of 6 x 8 cm were dowelled onto the base plate and the intermediate space was covered with poured concrete. On top of that 33 mm thick spruce board was nailed, so that the floor can withstand heavy trucks.

Kaufmann Michael – Beam Assembly Hall, Reuthe
Kaufmann Michael – Beam Assembly Hall, Reuthe
Kaufmann Michael – Beam Assembly Hall, Reuthe
Kaufmann Michael – Beam Assembly Hall, Reuthe

Project Details

Project support
Project Management
Structural Engineering
DI Ingo Gehrer, Höchst
Heating Ventilation and Sanitary Planning
Michael Kaufmann, Reuthe
Publikationen
Hineinverwittern in die Landschaft
Z-087Zuschnitt, 4/2001, S. 18-192001
Abbundhalle in Reuthe
B-008Gestalten mit der Welle, S.140-145,1581998
Zimmerei
B-003Sommer / Weißer / HolletschekArchitektur für die Arbeitswelt, Birkhäuser, S. 92-951995
Werkhalle in Reuthe
Z-028Architecture + Detail, 4/1995, S.50-551995
Abbundhalle Baien in Reuthe
B-014Dietmar SteinerArchitektur Beispiele Eternit, S.202/2031994
Abbundhalle Reuthe
Z-029Holz Bulletin, H.27/1991, S. 374-3761991
Copyrights
Text
Hermann Kaufmann + Partner ZT GmbH, Englisch: Bronwen Rolls
Photography
Hermann Kaufmann + Partner ZT GmbH
More Projects